Berkeley Place

Highlights

Base building infrastructure work that included mechanical and electrical upgrades along with adding two sets of gang bathrooms. 


Construction of demising walls creating individual suites which were all individually metered. Upgraded all life safety accordingly.


Two floor, recreational tenant buildout included an interconnecting stair.


Details

Architect KRA Architecture and Design


MEP Engineer Method Engineering Group 


Size 36,000 sf


Cost $1,840,000


Schedule 120 days 