Base building infrastructure work that included mechanical and electrical upgrades along with adding two sets of gang bathrooms.
Construction of demising walls creating individual suites which were all individually metered. Upgraded all life safety accordingly.
Two floor, recreational tenant buildout included an interconnecting stair.
Architect KRA Architecture and Design
MEP Engineer Method Engineering Group
Size 36,000 sf
Cost $1,840,000
Schedule 120 days